22选五体育彩票千赢体育vip888球盘体育即时比分
333彩票软件下载最新下载app切换旧版新浪即时比分棋牌游戏正规平台软件
310大赢家体育网
310v大赢家比分3千旺彩票代理千亿彩网官方app
234安卓官方彩票app千万彩票下载安装球琛足球比分
2d彩票中奖号码亲朋棋牌下载官网亲朋棋牌官方首页登录
258cc棋牌修复工具青海快3平台乾盈彩票app在线登录
310大赢家体育亲朋棋牌极速版下载亲朋棋牌下载格式
315彩票官方下载亲朋棋牌下载游戏棋牌游戏中心官方网
2串1竞彩高手青海体育彩票管网千万棋牌
306官方彩票彩请问手机买彩票怎么买棋牌游戏赢钱神器软件
306官方彩票是正规的千万彩票专业彩票投注平台亲朋棋牌安卓版
325棋牌游戏官方网千万彩票app怎么样千亿娱彩票app下载113彩票
310大赢家体育网
- Proximity and cost of utilities such as electricity, gas, septic/sewer and water/well, all of which require permitting and construction.
- The cost and extent of site development; for example, steeply sloped lots increase excavation, grading, and foundation costs significantly but can include the extra square footage of a “walk out” or fully finished basement.
- Additional design features, such as decking, trellises, finished lower levels and site-built connectors.
- Environmental restrictions such as wetlands, conservation, or coastal areas.
- Access to the site for delivery and installation.
258竞彩靠谱亲朋棋牌下载大厅千禧体彩排列三试机号
310大赢家体育网
325游戏币天天电玩城球琛网蓝球即时比分球挥网足球比分
- Boundary survey that contains property lines, setbacks, contours (topo map), location of utilities (water, sewer, electrical, septic restrictions) and environmental restrictions (wetlands, conservation land, etc.)
- Soils Report (if applicable) will detail geology and seismic data so a structural engineer can determine necessary foundation requirements.
- Planning Dept. Regulations (using your site’s Assessor Parcel Number or ‘APN#’).
- Find out if your local jurisdiction requires any special planning reviews such as Design Review, Historical Review, etc., from the local building department.
- Photographs of your site in .jpg format.